Scope of Work: Installation of heating, ventilation, air conditioning, water supply, and sewage systems, along with a fixed fire suppression system. The engineering systems were prepared to allow each resident to connect their own air conditioner. Heat recovery units (HRVs) were individually designed and installed for each apartment.
MULTI-APARTMENT BUILDINGS AND ADMINISTRATIVE PREMISES PROJECT “NAUJASIS SKANSENAS” 2020–2025
Address:
Linkmenų g. 13-15, Vilnius
Linkmenų g. 13-15, Vilnius
Project details:
The sixth stage of the project is currently underway.
The sixth stage of the project is currently underway.
RESIDENTIAL HOUSING PROJECT “MATAU VILNIŲ”, 2019–2022
Scope of Work: Installation of indoor and outdoor water supply and sewage systems, heating, ventilation, air conditioning, fixed fire suppression systems, and a central heating unit. Each apartment is equipped with an individual heat recovery ventilation system. A modern heating system was implemented.
Address:
ALUDARIŲ G. 1, VILNIUS
ALUDARIŲ G. 1, VILNIUS
Project details:
Construction Stages I–IV
Construction Stages I–IV
Project features:
Each apartment is equipped with an individual heat recovery ventilation system.
A modern heating system was implemented.
Each apartment is equipped with an individual heat recovery ventilation system.
A modern heating system was implemented.