Scope of Work: Installation of heating, ventilation, air conditioning, water supply, and sewage systems. A geothermal boiler room and a heating system with "ground-to-water" heat pumps were installed for heat production, along with an "air-to-water" heat pump for additional domestic hot water preparation. Thanks to energy from boreholes, the system can be used for both heating and cooling. Underfloor heating was installed throughout the school building.
The building features an efficient ventilation and air conditioning system. Nine heat recovery ventilation systems were installed, six of which include steam humidifiers. The air supplied to the premises through the ventilation units is pre-heated and, when needed, cooled using high-efficiency external VRF system units.
Srovės g. 19, Vilnius
Project Area: 3,352 sq. m.
A building that meets
sustainability standards
Scope of Work: Installation of water supply, domestic and rainwater drainage systems, heating system, heat generation unit, fire water supply system, and cooling system.
PYLIMO G. 17, VILNIUS